Fort Worth Demo

Fort Worth, Texas

Site Grading in Fort Worth, TX

A lot that will not drain right, a building pad that needs to sit level before anything gets built on it, or ground that simply needs to be reshaped before it is usable. Fort Worth Demo handles the earthwork and the permitting that sometimes comes with it, so the site is actually ready when your project needs it to be.

What Site Grading Actually Covers

Leveling, Drainage and Building Pad Prep

Site grading covers reshaping the ground itself. That can mean leveling a lot, correcting a drainage problem so water moves away from a structure instead of toward it, cutting high ground down and filling low ground in to reach a target elevation, or building a level, compacted pad for a new structure to sit on. It is often the step between a cleared or demolished site and a genuinely usable one.

This is different from land clearing, which deals with vegetation and brush, and different from demolition, which is about removing a structure. Grading is about the dirt itself, and on a lot of projects, all three happen back to back.

Request A Quote

Get Your Free Quote

Tell us about your site and we will follow up shortly.

Name
Why Property Owners Call About Grading

The Reasons We See Most Often

  • A yard or lot that holds water instead of draining properly.
  • A building pad that needs to be leveled and compacted before construction starts.
  • Uneven ground left over after a structure came down.
  • Preparing raw land for a new build.
  • Correcting a drainage problem that is sending water toward a foundation instead of away from it.
  • A property that simply needs regrading before it can be used the way you actually want to use it.

Whatever the reason, the goal is the same. Move the right amount of material to the right places, and leave the site properly compacted and draining the way it should.

Site grading and earthwork in progress in Fort Worth, Texas
Residential Grading Versus Larger Development Grading

The Scale of the Project Changes What Applies

Most residential grading projects, correcting drainage on an existing lot or leveling ground for a home addition, are reviewed as part of the standard building permit process rather than triggering a separate grading permit on their own. Fort Worth's Stormwater Criteria Manual has specific requirements for single family residential lot drainage, and the city reviews proposed lot grading before a building permit is approved.

Larger projects are a different story. Fort Worth requires a full grading permit for any development activity disturbing one acre of land or more, or for a project that is part of a larger phased development that adds up to more than an acre total. A grading permit application requires grading and drainage plans prepared and sealed by a professional engineer, an approved drainage study, and a Stormwater Pollution Prevention Plan that complies with state requirements. We help you understand which category your project actually falls into before work starts, rather than after.

The Permit Most People Do Not Know Exists

Early Grading Permits Cover Earthwork Only

Here is something worth knowing if your project is large enough to need a grading permit at all. Fort Worth allows what is called an early grading permit, which covers land disturbance limited to earthwork only, issued ahead of the full grading permit. It lets earthwork start sooner, but it does not cover anything beyond that. Any land disturbance past pure earthwork still requires the standard grading permit, and performing work beyond earthwork under an early grading permit alone is treated as a violation.

Grading permits on larger projects also require sign off from multiple city departments, including Environmental Services, Urban Forestry, the Water Department, Park and Recreation, and Transportation and Public Works. If your site has trees that need to be protected during grading, Urban Forestry inspections are billed separately, and we coordinate that scheduling as part of the project rather than leaving it for you to track down.

Utility Locates Still Apply

The Same 811 Requirement as Any Digging Project

Grading involves moving earth, which means the same Texas law requiring notification to 811 at least two business days before digging applies here, the same as it does on a land clearing or foundation project. This matters even more on grading work, since fill and cut activity often happens close to existing water and sewer lines. We handle this notification as a standard part of every grading project.

What Site Grading Costs

Pricing Depends on the Work, Not Just the Size

The acreage or square footage involved is only part of the picture. A small residential drainage correction and a large building pad on a multi acre site are very different jobs even when the footprint numbers look similar on paper.

What Actually Changes the Number
  • How much material needs to be cut, filled or moved.
  • How far it needs to travel across the site.
  • The condition and slope of the existing ground.
  • Whether the project crosses into full grading permit territory with engineer sealed plans.

Rather than quote a flat rate that will not reflect your actual site, we give real pricing after seeing the property.

We will schedule a walkthrough.

Our Process

From Site Visit to Graded, Compacted Ground

  1. 1
    Step One

    SiteAssessment

    We walk the property, note existing grade, drainage patterns and soil conditions, and determine whether the project falls under standard review or requires a full grading permit.

  2. 2
    Step Two

    Permitting

    Depending on scope, this can include working with your engineer on grading and drainage plans, a Stormwater Pollution Prevention Plan, and 811 utility notification.

  3. 3
    Step Three

    Earthwork

    Material is cut, filled and moved to reach the grade your project actually needs.

  4. 4
    Step Four

    Compaction

    Fill material is compacted in stages to the standard your project requires, whether that is a building pad or a corrected drainage slope.

  5. 5
    Step Five

    Final Grade andInspection

    The site is brought to final grade, and where a permit requires it, inspected before the project is considered complete.

Grading Often Comes Before or After Other Work

Related Services

Frequently Asked Questions

Site Grading Questions We Hear Often

In most cases, no, standard residential drainage correction is generally reviewed as part of the building permit process rather than needing a separate grading permit. That changes if the project is large enough or part of a bigger development.

It is a permit that covers earthwork only, issued ahead of the full grading permit on larger projects, so earthwork can begin sooner. Anything beyond earthwork still requires the standard grading permit.

Yes, correcting how water moves across a property, especially away from a foundation, is one of the most common reasons people call us about grading.

We coordinate with your engineer on the grading and drainage plans a permit requires. We are not the engineer of record, but we make sure that piece is accounted for as part of the project.

Land clearing deals with vegetation and brush. Grading deals with the shape of the ground itself. Many projects need both, usually clearing first, then grading.

Yes, the same requirement that applies to any digging or excavation project applies here, and we handle that notification as a standard part of the process.

Ready to Get Your Site Properly Graded?

Tell us about the property, what is currently going on with it, and what you are hoping to use it for. We will help you understand what permitting actually applies and give you a straightforward quote.

Request A Quote

Get Your Free Quote

Tell us about your site and we will follow up shortly.

Name
Scroll to Top